fix(gatorwalk-factory): a plan adds the person's feedback to feedbackIncorporated only once (swamp-club #2852) #398

Merged
seth merged 1 commit from cue/2852-gatorwalk-feedback-dedupe into main 2026-09-30 23:15:43 +00:00
Owner

Fixes swamp-club #2852, a follow-up to #2770 (PR #396) from its adversarial review.

After revise → plan → plan-review (open high finding) → rework → plan, the plan stage is handed the plan feedback the last plan already answered, and the prompt told the planner to append it, so feedbackIncorporated (and plan_revised in the Lab) could list the same round twice.

  • The plan prompts in swamp-club-swamp-extensions, build-swamp-extension and starter now carry the last plan's list forward and add the feedback only when it is not already the list's last entry.
  • starters.ts regenerated.
  • factories_test checks each plan prompt for the instruction.

Prompt-only; no engine change. verify-build and verify-reviews passed at 4ebdeab7fbed6a8d18e80d9f5481b6f914861d78, and the attestation is posted.

🤖 Generated with Claude Code

Fixes swamp-club #2852, a follow-up to #2770 (PR #396) from its adversarial review. After revise → plan → plan-review (open high finding) → rework → plan, the plan stage is handed the plan feedback the last plan already answered, and the prompt told the planner to append it, so `feedbackIncorporated` (and `plan_revised` in the Lab) could list the same round twice. - The plan prompts in swamp-club-swamp-extensions, build-swamp-extension and starter now carry the last plan's list forward and add the feedback only when it is not already the list's last entry. - `starters.ts` regenerated. - `factories_test` checks each plan prompt for the instruction. Prompt-only; no engine change. verify-build and verify-reviews passed at `4ebdeab7fbed6a8d18e80d9f5481b6f914861d78`, and the attestation is posted. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
fix(gatorwalk-factory): a plan adds the person's feedback to feedbackIncorporated only once (swamp-club #2852)
All checks were successful
CI / Review Integrity (pull_request) Successful in 52s
CI / Validate Attestation (pull_request) Successful in 1m21s
4ebdeab7fb
After revise then rework, the plan stage is handed the feedback the last plan
already answered. The plan prompts in the three example factories now carry
the last plan's list forward and add the feedback only when it is not already
the list's last entry, so plan_revised does not show the same round twice.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
seth merged commit c26064ad5c into main 2026-09-30 23:15:43 +00:00
seth deleted branch cue/2852-gatorwalk-feedback-dedupe 2026-09-30 23:15:43 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
swamp-club/swamp-extensions!398
No description provided.